"

Case studies

Tridan’s successful track record of projects for our partners has not simply been due to the machinery we have, the skill of our staff, the size of our premises or the breadth and depth of experience provided by membership of the Langham Industries group.

It is about how the Tridan team work rapidly to fully understand our partners’ requirements and develop high quality, innovative and cost-effective solutions.

Tridan continue to strengthen existing relationships and win new business from partners who appreciate that we are at the forefront of our industry through our ongoing training, research and investments.

To demonstrate these successes we have drawn together a number of case studies from across a range of industries that illustrate the typical life cycle of a Tridan engineering project from initial problem identification to successful solution.

  • Case study 1

    A leading US-based manufacturer of biomedical instruments opened a manufacturing facility in the UK to make instrument modules for final assembly at the company’s American HQ.

    Read more >

  • Case study 2

    Bruntons Propellers (Bruntons) manufacture high performance marine propellers for fast patrol boats, navies and boat owners requiring performance propellers.

    Read more >

  • Case study 3

    A leading European manufacturer in the food processing industry was experiencing delivery, quality and price stability with their incumbent suppliers.

    Read more >

  • Case study 4

    A leading UK manufacturer in the electrical motors, generators and power electronics field won a substantial order for the fuel management cooling system on the Boeing 787 (Dreamliner). Their incumbent suppliers were not AS9100 accredited, which was a pre-requisite of the contract from Boeing.

    Read more >